OCEAN TECHNICAL SERVICES LTD
SUBSEA CONSTRUCTION CONSULTANCY
Consultant and Representative to all sub sea construction
and Inspection contracts to the offshore oil / gas and 
Civil Engineering industry 
Telephone:  UK 01502 740735
 
 
Tony Mickleburgh

 

CURRICULUM VITAE

  

 
I have been involved with all aspects of offshore work both safety and contractual on Pipe lay - umbilical lay - rock dumping - spool installations – Hyper-baric welding - Trenching - Pipeline repair – Sub sea completions - Wellhead abandonment - Pipeline shore pulls - Outfalls - Inlets - IRM - civil engineering projects - pile removal and repair - seawater intake construction - fish deterrent system installation.
 
I have also been involved and written manuals on wellhead maintenance, repair and deep water pipeline repair techniques and Hydrate removal procedures. Various work capacities both on and offshore. Audits assessments on diving and marine operations from D.P DSV and anchor type vessels. For the last 20 years I have been involved with all aspects of sub sea wellheads from installation, work over, repair, and commissioning, working with FMC, FSSL, Reagan, Cameron, and Konsburg.
TONY MICKLEBURGH Managing Director OTS
WORK HISTORY FROM 1990 -2005
 
 
 
 
 
Summary of Qualifications
 

1970 – Management Studies City & Guilds Gt. Yarmouth College

1974 - Northern Divers School of diving D.O.E. Commercial oilfield diving course. Air diving – Standard dress - KMB - SCUBA - Burning Techniques – Construction.

1976 - Comex Diving Ltd Mix - Mix Gas course - Oxy-arc cutting course rigging course including spool and hydro couples.

1977 - Magna Flux Ltd Ultrasonic techniques and MPI course.

1979 - Norwegian Bell Divers certificate No 254.1981 AODC Divers certificate of competence No 1754

1984 - PETANS Offshore survival course

1985 - A.N.S.T. Critical wall thickness/laminations grade 1

1985 - Orca Ltd Client Representative quality assurance system course and computerised Inspection techniques.

1991 - DSV.DP Course - Lowestoft marine college

1996 - PETANS Offshore survival refresher course

1996 – FMC Aberdeen hydraulic actuator course

1998 - Shell UK PTW and offshore safety course

2002 - Hydraulic Pressure Testing Course (C&M Hydraulics Ltd).

2004 - March-PETANS Offshore survival refresher course

2005 - Feb Offshore Medical

 

Summary of work experience 2000-2005
Client Representative/Marine diving consultant
 
 
2004-2005  J. P Kenny Ltd (London). Dive/Construction Consultant for Sadra south Pars gas field development IRAN.
 
2003-2004  J. P Kenny Ltd (London). Project Client Representative for rectification of 10inch flexible pipeline across the Solent. Based in London office to produce procedures and working on all offshore activities from survey, investigation repair and final commissioning.
 
2003- Shell Expro UK Ltd – Dive/Construction Representative. Gas lift spool installation, wellhead intervention for insertion of DHSV using straddle valve, Chemical flushing downhole, wellhead isolation. Recovery of xmas trees and replacement. Trenching GoldenEye project.
Vessels: (DSV Aquamarine)(DSV Well ops Seawell)(Dredge barge Manta)
 
2003 – Centrica Rough Storage UK (Southern North Sea)
Snr Client /diving Representative DSV Aquamarine IRM and riser clamp installation
 
2002-2003 – J. P Kenny/Bord Gais Ireland (Irish Sea - Isle Of Man Offshore)
Snr Client Representative on Interconnector 2  project. The installation  of 30 & 10 inch pipelines and tie-ins with protection structure
 
2002 – Exxon/Mobil (Office based Gt Yarmouth)
Office based updating wellhead and platform inspection and maintenance manuals for platforms and wellheads..
 
2001 – Exxon/Mobil (North Sea southern sector)
Client Representative Wellhead intervention for hydraulic leak on DHSV. Investigation and isolations for rectification.
 
2001- SAIBOS Construction (West Africa Angola)
Client Representative on Seaway Kestrel for installation of gooseneck spools and doghouse protection covers on three riser towers on Girassol project for ELF exploration Ltd Angola. Oversee construction and contractual obligations for the contract.
 
2001 – Cal energy Ltd (North Sea southern sector)
Client Representative annual IRM, Chemical injection valve and hydraulic compensator replacement. Wellhead isolations and valve operations.
 
2001 - BP-Arco (North Sea southern sector)
Client Representative annual IRM, Pipeline remedial, wellhead hydraulic leak investigation, chemical jumpers hose change out, Choke insert removal and replacement. Wellhead isolations and valve operations. Office based working on wellhead and platform inspection and maintenance manuals. Annual acoustic pipeline survey. Audit / Inventory for Sub sea wellhead equipment. Certification on all sub sea hoses and lifting equipment. Procurement of fittings and tools for wellhead maintenance. Establish Inventory records for management system of all Sub sea equipment.
 
2000 - Bechtel Ltd  (Gt Yarmouth Harbour)
Supervise/Diving Consultant GT. Yarmouth power project Declutched pile repair - Seawater intake construction - Sheet pile removal for inlet - Pipe spool installation - Anode installation - produce daily activity log and produce method and approve procedures - oversee safety and onshore diving regulations working with local port authority.
 
2000 - Arco British Ltd (North Sea southern sector)
Client Representative - Annual ROV / Diving I.R.M. programme working in office writing procedures and maintenance on sub sea container. Control pod removal and installation, annulus pressure transmitter change out.
Pipeline span rectification on infield and export pipelines

 

Summary of work experience 1990-2000
Client Representative/Marine diving consultant
 
 
1999- Arco British Ltd (North Sea southern sector)
Client Representative - Annual ROV / Diving I.R.M. programme
Wellhead abandonment programme - Various maintenance tasks for repair of wellheads.
 
1999 - Conoco UK (North Sea southern sector)
Client Representative
Sub sea wellhead production choke change out on NW bell wellhead.
 
1998 - J.P. Kenny Ltd (Office based London)
Diving consultant for deep-water repair procedures. Produce Emergency procedure Manual for: Leak Response - Hydrate response and rectification - Pipeline repair Diver and Remote range - ROV/Diving equipment for repair techniques - Emergency contact - Commissioning - Emergency pipe lay recovery for Diver/ROV intervention.
 
1998 - Amerada Hess (North Sea northern sector)
Client Representative flushing pigging and cleaning operations on Hudson 10" & 8" pipelines into manifold from Shell Tern Alpha - monitoring diving operations for valve isolations.
 
1997 - Britannia Development (North Sea northern sector)
Alliance Marine Representative Based in London office for procedures and working on all offshore activities for Pipeline division. Onboard Castoro 6 during 14" & 28" lay (240klms). Responsible to all members of the Alliance (Conoco, Chevron, EMC & J.P.Kenny) for all aspects of offshore activities including care and co-ordination of 3rd party operations and assets. Operations included procedure writing, HAZIP & HAZOPS, anchor positioning, Pipe pull & lay, trenching, umbilical installation, spool piece tie-ins, rock dumping and as built reports.
 
1996 - Arco British Ltd (North Sea southern sector)
Client Representative Trent & Tyne development, over seeing activities on pipe lay vessel Lorelay. Pipe burial on Allseas Trenchsetter and onboard the Seaway Harrier for Hyperbaric tee installations, metrology and spool piece installations. Also on drilling rig Rowan Halifax for wellhead
 
1995-1996 - Arco British Ltd (North Sea southern sector)
Conoco UK - Client Representative (combined operations) Marine Superintendent onboard Rockwater 1 & Semi 1 Overseeing all aspects of the Gawain, Jupiter developments. Co-ordination and control of all vessels within project including pipe lay on Castoro 6, trenching, riser installation, umbilical installation, spool and wellhead installation, pigging & testing, and wellhead commissioning.
 
1993-1994 - Arco China Inc (South China Seas)
Marine Superintendent On L.B. Semac 1 for development of Yacheng - China sub sea pipeline and construction activities in the South China Sea. Pipe lay from Hong Kong to Hannah Island 708KLM 28" and 16" into Island and pipe-pull from beach.
 
1993- Phillips Petroleum Ltd (North Sea southern sector)
Client Representative Office based at Bacton production and writing of wellhead maintenance manuals Produce work scope for ROV survey for wellhead hydraulic leak and install wellhead Umbilical. Ann project Onboard DSV.DP Seaway Harrier for pipeline metrology and mattress installation. Audrey wellhead remedial and removal of production spool and installation.
 
1993 - Arco British Ltd (North Sea southern sector)
Client Representative Orwell project for Thames field developments onboard L.B. Lorelay for pipeline installation of 16" X 3" piggy back from Orwell sub sea wellhead to Thames platform. Onboard trenching vessel Trenchsetter and DSV Seaway Harrier for spool tie-ins.
 
1992- Phillips Petroleum Ltd (North Sea southern sector)
Client Representative Recovery and installation of 10" pipeline for repair and wellhead spools, install flexi spool with PLEM. Hydro testing and de-watering of pipeline, testing and commissioning.
 
1992 - Conoco UK (North Sea southern sector)
Client Representative CMS development onboard L.M. Balder for pipe pull operations from beach and diving operations for Floatation tanks removal.
 
1992- Phillips Petroleum Ltd (North Sea southern sector)
Client Representative IRM sub sea wellheads - Office based (Bacton) produce work scope and scheduling for diving activities for DSV operations. Mobilise vessel for survey and maintenance for damage pipeline and spool removal.
 
1992 - Arco British Ltd (North Sea southern sector)
Client Representative Pickerill development On board trench barge 331 for jetting in pipeline and post ditch survey from inshore pull. Metrology for spool installation, spool installation and hydro-test. Inspection and rectification of 3" piggy- back line. ROV observation for topside jacket and sub sea platform installation.
 
1991 - British Aerospace (North Sea southern sector)
Client Representative Scour rectification on Tripod satellites
 
1991 - Arco British Ltd (North Sea southern sector)
Client Representative Annual ROV / Diving I.R.M. programme Various maintenance tasks for repair off wellheads.
 
1990 - Phillips Petroleum Ltd (North Sea southern sector)
Client Representative Annual IRM for platforms and wellheads. Remedial umbilical repair and jumper hose change out, control pod removal and installation. Installation of replacement weak-link assembly. Installation of strengthening brace and riser protection guards.
 
1990 - Shell Exploration (North Sea southern sector)
Client Representative Bacton outfall extension and construction of pile support.